dilbert said:Tugela said:dilbert said:Hector1970 said:Maybe you have some inside info. I'd find it strange there would be a 7D3 already in the works.
...
How long do you think it takes Canon to design, engineer, test and tool up a new camera?
6 months?
More like 12-18 months, for the high end models, since those required high tolerances. The cheap plastic ones turn around faster.
Double your estimates. Q/A testing is at least 6 months alone for higher end models.
I'm talking about manufacturing lock. Actual development goes deeper than that.
Upvote
0